rear springs reset level and some 50mm blocks
take 2 coils off the front at least
my first build
-
- Posts: 3434
- Joined: Mon Dec 08, 2008 12:48 pm
- State: NOT ENTERED
- Location: Brisbane
Re: my first build
kmawic
Re: my first build
Ive been looking for this old link for hours.
http://www.impalas.net/forums/showthrea ... 86&page=22
http://www.impalas.net/forums/showthrea ... 86&page=22
--------------------------------------------------------------------------------
Elwood: I bet these cops got SCMODS.
Jake: SCMODS?
Elwood: State County Municipal Offender Data System.
W.S.C.C.A.
St Marys chapter.
Elwood: I bet these cops got SCMODS.
Jake: SCMODS?
Elwood: State County Municipal Offender Data System.
W.S.C.C.A.
St Marys chapter.
Re: my first build
Sold me on that one!wot179 wrote:Hose on some 2K clear to preserve that finish.
Red motor,stick shift and dump it.
The wagon looks awesome with that finish
And I was thinking of air bags but yea prob just dump it

Re: my first build
i got hr front end now and shed is up!
ive organised to have a clear coat and some metal flake painted in white flash
i reckon its gunna be a 161, my bother in law gave the block
and watch for air bags,
as soon as i have pics ill post but this is work in progress
ive organised to have a clear coat and some metal flake painted in white flash
i reckon its gunna be a 161, my bother in law gave the block
and watch for air bags,
as soon as i have pics ill post but this is work in progress
Re: my first build
not doing air bags anymore, just as low as possible,
floor is half cut out now and will be bracing and taking out windows to make whole new floor lucky the bf is a sheety and is going to teach me to weld.
then hr front end to go in and clean up engine and will be running at least
we arent bogging her at all and will fix rust spots and larger sections, trying to keep as much original paint as possible
floor is half cut out now and will be bracing and taking out windows to make whole new floor lucky the bf is a sheety and is going to teach me to weld.
then hr front end to go in and clean up engine and will be running at least
we arent bogging her at all and will fix rust spots and larger sections, trying to keep as much original paint as possible