wow this had dropped to half way down the third page

but its great to see so much action onsite
up to date Ive only slotted the 5 ltr into position to have a squiz at things , its been cleaned up and etched.
The front doors are cut and stretched ,clamped together and awaiting some back doors to fit and be sure before welding .
Pillars have been removed .
The boot is in hifill 2k and the quarter close to it.
The rear below the boot is ready for hifill aswell .
Today I cleaned up the interior floor and remembered I need to put a big tunnel in , and cleaning revealed some holes in the floor dear liza.
Happy all the dirty jobs are over as of today .

Easily distracted angle manipulator extrordinaire.